Reinforcement of foundations, floors, driveways, ramps, and other building structures

The room must work, even if the floor is moving beneath your feet.
We perform foundation lifting and reinforcement without the need to halt warehouse or production operations, and without dismantling or stopping warehouse equipment – delivering results as quickly, economically, and reliably as possible.

Priority 1 for our team is always to minimize disruption during the execution of a restoration project, which often takes place in real-time at the facility. Uretek methods consist of a set of technologies and operations for void filling and slab lifting, most often carried out at night, outside regular business hours of the tenant or property owner.

Uretek employs its proprietary solutions in project design and materials, particularly Deep Injection and Slab Lifting technologies, using geopolymer resins with various properties and characteristics. On average, Uretek projects are completed four times faster than traditional methods and 1.5–2 times cheaper when considering full costs.

Our frequent clients include retail chains across the five continents where Uretek operates. If a store or warehouse experiences significant inconvenience due to uneven floors or instability caused by soil settlement over time or a man-made incident, our specialists resolve the issue safely and efficiently.
A typical project involves spaces with concrete floor slabs 100–150 mm thick, with uneven settlement over areas exceeding 800 m² of warehouse or retail space. In many regions, a common temporary solution prior to engaging Uretek contractors is placing metal shims under the deforming structures. Average settlement on such sites can reach up to 76 mm from the floor surface.

Uneven floors can make shelves or storage racks unsafe, unusable, or unstable, creating hazards for employees or customers. Without proper leveling, facilities must be closed and reconstructed to meet safety standards. That’s why leveling the floor first is critical – it allows the business to continue generating revenue instead of losing money due to downtime. Safety and efficiency remain non-negotiable requirements of our solutions.
24/7. Only Uretek can do that!
Don’t face this challenge alone. Get as much information as possible to make an objective decision. From our experience, 2 out of 3 clients who contact us choose to carry out an inspection and review the recommendations.

Don’t put it off — trust the experience and professionalism of our team, and we will help you save and restore what matters to you.
If you’ve reached this section, it means you are ready to take responsibility for the future of your property. We value your care and invite you to take the first step toward saving your valuable asset that is undergoing deterioration. However, don’t rush your decision — your well-being and safety matter.

Start with a minimally required inspection of your building at a reasonable cost to avoid risks and make an informed decision. By obtaining a clear picture of the scale of the problem, you will be able to decide on the next steps. You have three options:
Carefully monitor the progression of damage using professional tools, identifying the “point of no return”
Develop a solution plan taking into account structural, financial, and practical constraints, and implement it
Seek alternative solutions from third parties based on the conducted inspection
Get a free consultation with a geotechnical engineer to discuss your specific case and identify the best solutions
Risks caused by foundation deformation and damage:
Damage to communications that are laid under or near load-bearing structures;
Damage to the building's internal communications;
Damage to load-bearing walls, partitions, and ceilings;
Повреждение систем водоотведения;
Damage to the pavement and external buildings;
Shortening the life of the building;
Pre-emergency condition and the need for unscheduled major repairs;
Inconvenience of building operation and life-threatening conditions;
Heat loss and mold are caused by damaged waterproofing.
What happens to a building or structure?
What caused the cracks or structural displacements?
Is there any point in waiting for improvements or changes, and what kind of changes are we talking about?
Is a cosmetic repair sufficient, and for how long?
What will happen if I don't do anything, and by when?
Will "store-bought or do-it-yourself" solutions help, and what exactly?
Will the "familiar foreman" be able to solve the issue?
Is it possible to slow down or stop the destruction process?
Is it possible to return to the previous state? What are the options?
When is the best and cheapest time to start solving it? Or can it be done later?
What can you get for X rubles?
How much does the solution cost, and what are the implementation conditions?
Questions Uretek can answer:
No demolition or removal works required
International expertise and database of projects
Work warranty and safety from 5 to 60 years
Long‑term stable polymer resin
Visible and instrumentally verifiable results
Custom material and technical solution design for each project
Results immediately after work completion
Suitable for different types of structures
Environmentally neutral technology and waste disposal
Increases service life and property value
Approved international technologies
Brand history and technological development since 1978
No demolition or removal works required
International expertise and database of projects
Work warranty and safety from 5 to 60 years
Long‑term stable polymer resin
Visible and instrumentally verifiable results
Custom material and technical solution design for each project
Results immediately after work completion
Suitable for different types of structures
Environmentally neutral technology and waste disposal
Increases service life and property value
Approved international technologies
Brand history and technological development since 1978
In any difficult situation, it is important to consciously assess the risks of a decision or inaction with a construction expert.
By contacting URETEK, you will be able to:
  • Figure out what's going on
  • Increase the operating time of the facility
  • Make an informed and well-considered decision for yourself
  • Take control of the asset's condition
  • Stop the loss of asset value
  • Choose the most suitable way to implement the solution

Completed projects

Examples of сompleted projects in Russia and abroad

Almost instant results
Choosing and defining the appropriate solution together with the client
Only top brands of equipment and tools
The possibility of implementing the project in stages according to the client's required schedule
Post-project monitoring and promptness in case of necessary improvements. 24/7 communication
Parallel improvement of the characteristics of hydro-, heat- and vibration insulation of structures
We guarantee:
5 year
minimum warranty on completed work
0,5 mm
precision of the performed work
2-3 days
for completing a standard project
material curing time
18 sec
savings compared to other technologies
25%